
|
Projects List 3 |
|
Ion Systems, Berkeley, CA 1993 |
|
This project involved the total renovation, fire repair and seismic upgrade of a 13,500 square foot concrete tilt-up building. A new second floor structure was added to the building for office use. |
|
Carquinez Dental Group, Benicia, CA 1992, 2001 |
|
A mixed use building with residential apartments above a dental clinic in the historic downtown area of Benicia, California. A remodel and addition were completed in 2001. |
|
A R C H I T E C T |

|
Grant Avenue Renovation, San Francisco, CA 2003 |
|
This project involved the historic renovation and seismic upgrade of a registered downtown landmark building. The first and second floors were rebuilt to accurately match the original architectural detailing of the storefront and original granite clad façade of this 1907 building. |